Energy · Public consultation · DOGC 22 October 2026

The new 220 kV line through Quatre Pilans and Grealó

Red Eléctrica wants to change the route of the Mangraners–Begues double-circuit line between towers T-7 and T-31 to move it away from the future Torreblanca–Quatre Pilans industrial estate. The new stretch is 6 km long and has 21 new towers, twelve of them in the Terme de Grealó. The project is open to public consultation.

6,031 m
of new line: 5,681 m in Lleida and 350 m in Torregrossa
21
new towers, between 36 and 48.6 m high
64
affected plots, according to the list published in the DOGC
9.8 ha
of overhang easement, and 6.4 ha of temporary occupation during the works
Deadline for objections

Until 3 December 2026

That is 30 working days from the day after publication in the DOGC on 22 October. The date is our own calculation: confirm it with the authorities if you need to submit anything.

How to submit them

Through the Generalitat's general request form, addressed to the Territorial Services of Territory in Lleida, with the file number in the subject line:

FUE-2026-05234106

The project can be consulted on the Generalitat's notice board or, by appointment on 973 246 650, at Camp de Mart, 35, Lleida. If you own a plot on the list, you can also request the correction of errors there.

The map

Where the line would run

Route, towers and affected areas reconstructed from the project's coordinates and maps. Tap a tower or a plot to see its details.

New towerTower with conditions in the environmental or heritage reportAxis of the diversion

Loading map layers…

How it was made: the position of the towers comes from the UTM coordinates of the 37 crossings and the distances in the project's list of towers. We checked it against the parcel maps (less than 0.3 m difference) and the Cadastre: each tower falls on the plot stated in the DOGC. The overhang easement matches the published list plot by plot. The temporary occupation and access routes are approximate. Plots are shown without the owners' names, which appear in the official notice. Natura 2000 site: European Environment Agency boundaries (2024). Current line: OpenStreetMap. Base map: ICGC (CC BY 4.0).

Download the map (KML, for Google Earth or QGIS) List of towers with coordinates (CSV) Map layers (GeoJSON)

Translated from the Catalan original. In case of discrepancy, the Catalan version prevails.

What is proposed

A diversion to make room for the estate

The 220 kV Mangraners–Juneda–l’Espluga–Montblanc–Penedès–Begues line is being converted to double circuit. The Generalitat authorised the project and the first two addenda on 22 December 2022, and a third in May 2025. Red Eléctrica is now asking to modify this authorisation with a fourth addendum, dated January 2026, to «compatibilitzar el traçat autoritzat amb el futur desenvolupament del polígon de Torreblanca-Quatre Pilans» [make the authorised route compatible with the future development of the Torreblanca-Quatre Pilans estate]. [1]

The new stretch starts at tower T-7, near the Mangraners substation, crosses the N-240, the oil pipeline and the Femosa irrigation channel, and follows the road to T-18A. There it turns south-east, crosses the Terme de Grealó and reaches T-31, already in the municipality of Torregrossa. Towers T-7 and T-31 keep their authorised position; their orientation and height change. [1]

The route crosses three districts: Les Canals (about 0.2 km), Quatre Pilans (about 2 km, seven towers) and the Terme de Grealó (about 3.5 km, twelve towers).

What it means for the plots

The declaration of public utility implies the need to occupy the affected property and its urgent occupation. The overhead right of way includes the overhang of the cables, the towers, access to inspect and repair the line and the felling of trees where necessary. [1]

From T-10A to T-16A the towers fall on plots owned by the Institut Català del Sòl, the estate's promoter. In the Terme de Grealó it is different: from T-21A to T-31, six of the seven towers are on privately owned plots, most of them irrigated land and orchards.

The current line

According to the environmental report, in exchange the stretch of the current line that crosses the Natura 2000 site Secans de Mas de Melons–Alfés, 3.77 km long, would be dismantled. [2]

List of towers in the project

The 21 towers

Tap a tower number to locate it on the map.

TowerDistrictHeight (m)TypePlot land useNotes
T-7Les Canals41Angle or anchor D2A19crops, pasture, scrub woodlandPosition already authorised in 2022. Archaeological monitoring (archaeological expectation zone ZEA 1).
T-8AQuatre Pilans46Angle or anchor D2A60scrub, crops, arable land
T-9AQuatre Pilans39,6Suspension D2S2Lscrub, crops, arable land
T-10AQuatre Pilans39,6Suspension D2S2Lunproductive, almond trees
T-11AQuatre Pilans39,6Suspension D2S2Lunproductive, almond trees
T-12AQuatre Pilans36,6Suspension D2S2Lunproductive, almond trees
T-13AQuatre Pilans36,6Suspension D2S2Lcrops, pasture, scrub woodland
T-14AQuatre Pilans39,6Suspension D2S2Lcrops, pasture, scrub woodland
T-15ATerme de Grealó42,6Suspension D2S2Lcrops, pasture, scrub woodland
T-16ATerme de Grealó46,35Suspension D2S4Vcrops, pasture, scrub woodlandRight next to natural vegetation.
T-17ATerme de Grealó45,6Suspension D2S2Lirrigated cropsWithin natural vegetation. The temporary occupation touches the Limonium catalaunicum area and must be excluded.
T-18ATerme de Grealó36Angle or anchor D2A35irrigated crops
T-19ATerme de Grealó42,6Suspension D2S2Lirrigated crops, irrigated orchards
T-20ATerme de Grealó39,6Suspension D2S2Lscrub, irrigated orchardsRight next to natural vegetation.
T-21ATerme de Grealó42,6Suspension D2S2Lirrigated crops, pastureRight next to natural vegetation.
T-22ATerme de Grealó42,6Suspension D2S2Lirrigated crops, scrubWithin natural vegetation.
T-23ATerme de Grealó42,6Suspension D2S2Lapricot treesRight next to natural vegetation.
T-24ATerme de Grealó39,6Suspension D2S2Lnectarine treesOn the Fonteta de Grealó archaeological site. Archaeological monitoring.
T-25ATerme de Grealó42,6Suspension D2S2Lirrigated crops
T-26ATerme de Grealó48,6Suspension D2S2Lpistachio trees
T-31Torregrossa36Angle or anchor D2A60scrub, orchardsPosition already authorised in 2022. Within natural vegetation.

Source: project report, list of towers; land use, list of property and rights in the DOGC; notes, environmental impact report and report from the Department of Culture. [1] [2]

Environmental impact report

No full assessment, but with conditions

The Generalitat has decided that the modification does not need to undergo a full environmental impact assessment, but it sets conditions. [2]

  • No works between 15 December and 15 June, the wildlife breeding season.
  • Assembly with a crane boom or panels at the towers within natural vegetation (T-17A, T-22A and T-31), without storing materials on site.
  • Protect Limonium catalaunicum between T-16A and T-17A: outside the temporary occupation.
  • Bird diverters on all spans and monitoring of bird mortality for ten years. The area is home to the red kite and the lesser grey shrike, both endangered.
  • Cleaning of machinery to prevent the spread of invasive species.
Heritage

A tower on an archaeological site

The Department of Culture warns that tower T-24A stands on the site of la Fonteta de Grealó, from the Roman Republican period, and asks for archaeological monitoring during earthworks. It also asks for it in the archaeological expectation zone around T-7. [2]

The Terme de Grealó is the district with the most listed archaeological sites in the Horta Sud.

What needs clarifying

Questions arising from the documents

  1. Does it cross the Natura 2000 site or not? The environmental report says the chosen route runs outside the protected site. With the European Environment Agency boundaries, however, tower T-7 and the first 220 m of line fall within the Torreribera part of the Secans de Mas de Melons–Alfés site. This needs to be checked against the Generalitat's official mapping.
  2. What is the agricultural impact in the Terme de Grealó? The Department of Agriculture asks for an analysis of agricultural impacts if farmland is affected. From T-18A to T-31 the line crosses working irrigated land and orchards. [2]
  3. How will la Fonteta de Grealó be protected if tower T-24A is not moved?
Documents

Official documents

  1. Public consultation notice for the fourth addendum. Territorial Services of Territory, Housing and Ecological Transition in Lleida, 15 October 2026. DOGC no. 9778, 22.10.2026 (PDF). Includes the list of the 64 affected plots. File FUE-2026-05234106.
  2. Environmental impact report. Resolution TER/3630/2026, of 28 September, DOGC no. 9775, 19.10.2026 (PDF). File OTAALL20260093.
  3. Technical project. Fourth addendum to the execution project, Red Eléctrica de España, January 2026, endorsement SE202600177. Available on the Generalitat's notice board and at the Territorial Services in Lleida.
  4. Where to submit objections. General request to the Generalitat, quoting file FUE-2026-05234106.
  5. Natura 2000 site ES5130040. Data form for the Secans de Mas de Melons–Alfés site, European Environment Agency.
  6. Plots. Geometry from the Directorate-General for the Cadastre (INSPIRE service), based on the cadastral references in the notice.

Page prepared by the association from the official documents. If you find an error, please write to us.